Compare the Analysis & Cost Estimation of Multistorey Building with Fast Track Technique

Abhishek Rai, Dipali Balwante, Purve Patel, Vishal Gupta, Swapnil Jadhav

Abstract


The present scenario, especially in metro cities demands rapidly construction to fulfill this fast track techniques is consider to accelerate, overlap or compress schedule has an impact on project predictability in terms of achieving the planned objective (cost and quality). Today Fast track development is quickly developing financially, bring increasing expense and efficient in development can remunerate critical extent of in general development cost. However no research directly address the relationship between fast track and conventional method objective. In this project the comparison between quantities and cost of precast standard member and conventional structural member is concluded. The cost is estimated for precast structure panel and RCC structure are compared with respect to cost and quantities. The precast structure is more economical and easy to construct as compare to conventional method.

 

Keywords: Accelerate, structural member, precast member, Quality, fast-track construction method, prefabrication, monolithic construction, precast construction etc.


Full Text:

PDF

References


S.Kaliranjan and B.G.Vishnuram (2010) ‘’S.Kaliranjan and B.G.Vishnuram

H.G.Vivekprasadand H.N.Rajendraprasad (sri.jayachamarajendra college of engineering, mysore) (2015) ‘’ Case study on conventional and fast track construction techniques’’.

Ivan holly, Iyad abrahoim (2020) ‘’Connection and joints in precast concrete structure ‘’

Hyder khudhair, haider al-Baghdadi, haitham muteb (2020) ‘’ Behaviour of precast concrete columns bases embedded in socket foundations with different bonding interfaces ‘’

Ahmad A. Alhomadi, Reza Dehghan and Janaka Y. RuwanpuraY (2013) ‘’ Time, Cost and Quality Predictability in Fast-Track Project ’’

Sayali A. More, Aishwarya V. Patil Journal-M- Tech final Year Student of construction Management, Department Of Project and construction management (2017) ‘’ Time, Cost, Productivity and Quality Analysis of Precast Buildings ’’

K.Priya, M.kathrisen, D.Vengateshwari, M.suriyakumari(Sri.Ramakrishna engg.college, perambalur) (2019) ‘’ Planning, analysis and construction scheduling of apartment building (G+13) by using primavera ‘’

CH. Lokesh Nishanth, Y. Sai Swaroop, Durga Chaitanya Kumar Jagarapu, Pavan Kumar Jogi (2017) ‘’ Analysis and design of commercial building with different slab arrangements using REVIT ’’

For design part-IS code 456-2000 (LSM), For lift- IS14665.1.2000, NBC VOL-1.


Refbacks

  • There are currently no refbacks.