|
Issue |
Title |
|
Vol 4, No 1 (2018) |
A Review on Earthquake Resistant Low-Cost Construction Techniques |
Abstract
|
Md. Anzar Rabbani, Md. Afzal Rabbani, Tinku Biswas |
|
Vol 9, No 2 (2023) |
A Review on Old Building Environment and Indoor Microbials |
Abstract
|
Dimpleben P. Sonwane, Mujahid Faiyas Husain |
|
Vol 6, No 1 (2020) |
A study on C, H and L type prismatic buildings for Synoptic wind flow. |
Abstract
|
Hirak Ranjan Das, Kalyan Kumar Das, Ajan Patowary |
|
Vol 3, No 1 (2017) |
A Study on Mechanical Properties and Fracture Behavior of Chopped Fiber Reinforced Self-Compacting Concrete |
Abstract
|
Vatsal Rajput, Rahul Rathore |
|
Vol 4, No 1 (2018) |
An Analysis of Effect of Eccentricity on Design of Isolated Footings |
Abstract
|
Ahmad Zaker Mudaser, Esmatullah Ziaye, Sayed Mosaib Sayafpoor |
|
Vol 4, No 1 (2018) |
Analysis and Design of Multi-Storey (G+2) Building |
Abstract
|
Vishal Malik |
|
Vol 4, No 2 (2018) |
Analysis and Design of Timber Box Beams Using Vlasov’s Theory |
Abstract
|
Ezeagu C. A |
|
Vol 7, No 1 (2021) |
Analysis of Critical Success Factors for Metro Construction Projects in India |
Abstract
|
Sayali Chavan, Rutuja Gaikwad, Neha Mandale, Pooja Bhirud, Shanthi P Selvam |
|
Vol 2, No 1 (2016) |
Analysis of Flat Slab by MATLAB Coding |
Abstract
|
Saurabh Nirkhe |
|
Vol 5, No 2 (2019) |
Analysis of Political Risks Affecting International Construction projects in Malaysia |
Abstract
|
Lihong Chen, Xiaopeng Deng, Tengyuan Chang |
|
Vol 2, No 1 (2016) |
Analysis of various thicknesses of Shear Wall with Opening and without Opening and their Percentage Reinforcement |
Abstract
|
S.H. Jagadale |
|
Vol 8, No 1 (2022) |
Application of Grouted Mechanical Couplers in Accelerated Bridge Construction |
Abstract
|
Yoon-Si Lee, Travis Hosteng |
|
Vol 6, No 2 (2020) |
Awareness of Total Quality Management and Extent Used in Construction Projects |
Abstract
|
keerthana solai, G.S. Jegan |
|
Vol 5, No 1 (2019) |
Bidding Strategy for Building Projects Based on Game Theory |
Abstract
|
M. Barath Priyan, K. Chinnaraju |
|
Vol 3, No 2 (2017) |
Business Process Re-engineering-Re-Aligning Processes for Market Leadership in Changing Business Environment |
Abstract
|
Anil Kr. Chojar |
|
Vol 6, No 1 (2020) |
Clash Detection in Appropriate Technology Building Using Building Information Modelling (BIM) |
Abstract
|
Aarthipriya. V, Chitra. G |
|
Vol 8, No 1 (2022) |
Comparison between FIDIC and NECForm for Turnkey Mode of Contracting |
Abstract
|
Smitha Yadav |
|
Vol 4, No 2 (2018) |
Compressive Strength, Water Absorption and Temperature Effects on Partial Replacing Cement with GGBS, Micro Silica and Fly Ash |
Abstract
|
A.Ananthi Rajesh |
|
Vol 1, No 1 (2015) |
Construction Claims’ Impacts on Project Performance Baselines |
Abstract
PDF
|
Raji Z. Al- Ani, Ala'a M. Shdiefat |
|
Vol 3, No 2 (2017) |
Correlation Between CBR Values and Index Properties of Soils |
Abstract
|
Intha Srinivasa Reddy |
|
Vol 7, No 2 (2021) |
Design and Analysis of G+5 Hospital Building using Prefabricated Construction Technique |
Abstract
|
Aakash Bind, Karan Chaskar, Tribhuvan Chauhan, Akash Korgaonkar, Dinesh Joshi |
|
Vol 5, No 2 (2019) |
Design and Construction of an Excavation Supported by Temporary Soldier-Pile Wall for Urban Road Corridor |
Abstract
|
Nilton de Souza Campelo, Sebastião Peres Neto, Elias Santos Souza, Ariel Oliveira Praia Lima, Daniel Jardim Almeida, José Lucinaldo Ferreira de Souza, Marcos Valério Mendonça Baia |
|
Vol 6, No 1 (2020) |
Determination of the optimum magnetic exposure time for magnetic water concrete |
Abstract
|
Temple Nwofor, C.H. AZUBUIKE |
|
Vol 9, No 1 (2023) |
Development of Smart Strips in The House for Safety Monitoring |
Abstract
|
Devyani Kadgaye, Rahul Chaudhari, Manish Narkhede |
|
Vol 3, No 2 (2017) |
Effect of Opening Shapes and Sizes on the Gravity Dam |
Abstract
|
P.K. Imliya, B.P. Mudgal |
|
1 - 25 of 92 Items |
1 2 3 4 > >> |