Delineate Catchment Areas of Vindhyachal Region Using Geospatial Techniques
Abstract
Full Text:
PDFReferences
Abdulla M.N. Catchment area delineation using GIS technique for Bekhma dam. TS09C Spatial Information Processing II. 5335. 2011; 18–22 May.
Djokic D., Ye Z. DEM preprocessing for efficient watershed delineation. Proceedings of ESRI; 1999; Redlands, California: ESRI Press; 2000. 66–83p.¬¬
Garbrecht J., Martz L.W. Digital Elevation model issues in water resources modeling. Proceedings of the 19th ESRI Users Conference. San Diego, CA; 1999.
Hydrologic Modeling with Arc Hydro Tools. Arc Hydro: GIS in Water Resources. Seminar/Workshop. Gainesville, Florida; November 15, 2007.
Henry A. Adornado and Masao Yoshida, GIS based watershed Analysis and Surface Runoff Estimation using Curve number (CN) value, Journal of Environmental Hydrology; 2010.
Suhas P Wani and Kaushal K Garg, Watershed Management Concept and Principles; 2009.
Tarboton D.G, Maidment D., Robayo O. Watershed Delineation from Digital Elevation Models. GIS in Water Resources. 2003.
Merwade V., Maidment D., Robayo O. Watershed and Stream Network Delineation. GIS in Water Resources. 2006.
Surface creation and Analysis, ESRI help, (access on 12/08/2014). [http://resources.esri.com/help/9.3/arcgisengine/java/gp_toolref/geoprocessing/surface_creation_and_analysis.html.
].Venkatesh Merwade., Watershed and Stream Network Delineation using Arc Hydro Tools; 2012.
DOI: https://doi.org/10.37628/jwre.v1i1.11