Sustainable Contractual Disputes in Managing Construction Project

Raji Z. Al- Ani, Heba Al-Qaisi, Faisal Arain

Abstract


Abstract
Understanding of the differences of construction dispute resolution processes and their ticklish methods will be undoubtedly priceless and precious to project managers in dealings with construction disputes, as they become an inescapable part of construction projects. The study is conducted to identify the main causes and impacts on project performance baselines (scope, cost and schedule). Outcomes of this study showed that the causes of contractual disputes are mainly related to: designers, site conditions, late deliveries, financial situations and increase in quantity. The research concluded that special attention must be given to the causes that outlined in this study will assist project managers in minimizing the risk of having contractual disputes and their impacts on projects baselines.

Keywords: contractual disputes, construction management, procurement management, project management, sustainable management

Full Text:

PDF

References


Carmichael D.G. Disputes and International Projects, Rotterdam, Netherlands A.A.: Balkema Publishers; 2002

Groton J.P. Alternative Dispute Resolution in the Construction Industry. Dispute Resolution Journal. 1997; 52(3): 49–57p.

Ashworth A. Contractual Procedures in the Construction Industry. 5th Edn. Harlow, England: Pearson Education Limited; 2006.

FIDIC. Part 3 – Conditions of Contract and Contract Forms, Geneva, International Federation of Consulting Engineers (Fédération Internationale des Ingénieurs-Conseils); 2010.

Richard J.P. Eds. EdWel Programs; PMP Exam Preparation Boot CAMP. 5th Edn. Project Engineering Corp in cooperation with Evolution Skillware, 2013. Retrieved in May 25, 2014 from; www.EdWal.com.

Wald M.H. Requirements of a Valid Texas Contract, 2013, Retrieved in May 8th, 2013; http://www.waldlaw.com/dallas_legal_services.htm

Weigelt M. Fixed-price contracts required by stimulus law. USA: Washington Technology; 2009: 1–5p,

Project Management Institute. (2013). A Guide to the Project Management Body of Knowledge. 5th Edn. Project Management Institute; 362–3p.

GEM. Project Delivery Methods, 2013, Retrieved in May 8, 2013, from; GEM Inc: http://www.gemincorporated.com/DeliveryMethods.html.

IBSS. Design-build, design-bid-build and contract management: how to select the one that is Right for you, 2005, Retrieved in May 25, 2014, from: http://www.tysonbuilding.com/images/SelectingProjectDelivery.pdf.

Brown H.J., Marriott A.L. ADR Principles and Practice. London, United Kingdom: Sweet & Maxwell; 1993.

Fenn P., Lowe D., Speck C. Conflicts and disputes in construction, construction management economics, USA. Journal of management in Engineering, ASCE.1997; 15(1): 513–8p.

Matyas R.M., Mathews A.A., Smith R.J., Perry P.E. Construction Dispute Review Board Manual. New York, USA: McGraw-Hill; 1996.

Hall J.M. Ineffective communication: Common causes of construction disputes: Alliance’s Advisory Council Legal Notes; 2002, 13(2).

Jeffery M.H. (2002). Ineffective Communication: Common Cause of Construction Disputes. Malaysia: Esq. Folk & Associates; PC, 13(2).

Farooqui U.R., Umer M., Lodi S., Saqib M. Dispute Resolution in the Pakistani Construction Industry – An Assessment of Current Methods. Third International Conference on Construction in Developing Countries. Advancing Civil, Architectural and Construction Engineering & Management; 2012; Bangkok, Thailand.

Matyas R.M., Mathews A.A., Smith R.J., Perry, P. E. Construction Dispute Review Board Manual. New York, USA: McGraw-Hill; 1996.

Onelc. Texas Civil Practice & Remedies Code - Section 154.023, 2007. Mediation. Retrieved in May 25 , 2014 from: http://law.onecle.com/texas/civil/154.023.00.html

Steen R.H. (1994). Five Steps to Resolving Construction Disputes without Litigation. Journal of Management in Engineering. 1994; 10(4): 19–21p.




DOI: https://doi.org/10.37628/ijce.v2i1.62

Refbacks

  • There are currently no refbacks.