Identification of KPIs in Construction Industry: A Review
Abstract
Full Text:
PDFReferences
Lebas J. Performance measurement and performance management. Int J Prod Econ. 1995; 21(3): 23–35p.
Ogunlana SO, Krit P, Vithool J. Construction delays in fast-growing economy: compairing Thailand with other economies. Int J Proj Manag. 1996; 14(1): 37–45p.
Samson M, Lema NM. Development of construction contractors performance measurement framework. 1st International Conference of Creating a Sustainable.
Kennerley M, Neely A. A framework of the factors affecting the evolution of performance measurement systems. Int J Oper Prod Manag. 2002; 22(11): 1222–1245p.
Cumby J, Conrod J. Non‐financial performance measures in the Canadian biotechnology industry. J Intellect Cap. 2001; 2(3): 261–272p. Doi: 10.1108/14691930110400001.
Epstein MJ, Manzoni J. The balanced scorecard and tableau debord: translating strategy into action. Manag Acc. 1997; 28–36p.
Kaplan RS, Norton DP. Strategic learning and the balanced scorecard. Strat Leadership. 1996; 24(5): 18–24p. Doi: 10.1108/eb054566.
UNRWA. Projects Completion Reports. Gaza: UNRWA; 2006.
Egan J. Rethinking Construction: Report of the Construction Task Force, London.
Kylili A, Fokadias PA, Jiamenez PAL. Key performance indicators (KPIs) approach in buildings renovation for the sustainability of the built environment: a review. Renew Sustain Energy Rev. 2016; 56: 906–915p.
Sezer AA. Construction Performance Measurement: Site Managers in Refurbishment Projects. Goteborg: Chalmers Repro Service; 2016.
Malmi T, Brown DA. Management control systems as a package – opportunities, challenges and research. Manag Acc Res. 2008; 19(4): 287–300p.
Helen BI, Emanual OO, Lawal A, Elkanah A. Factors influencing the performance of construction projects in Akure, Nigeria. Int J Civ Eng Constr Estate Manag. 2015; 3(2): 57–67p.
Joy T. A study on factors influencing quality of construction projects. Int J Res Appl Sci Eng Technol. 2014; 3(5): 384–387p.
Stojadinović Z, Marinković D, Ivković B. Human resource performance measurement framework for construction projects and companies. Techn News. 2014; 21(1): 69–78p.
Saraf DD. Study of factors affecting performance of construction project. Int J Sci Res. 2013; 4(5): 1339–1341p.
Sarhan S, Fox A. Performance measurement in the UK construction industry and its role in supporting the application of lean construction concepts. Australasian J Constr Econ Build. 2013; 13(1): 23–35p.
Elshakour HA, Al-Sulaihi I, Al-Ghatani K. Indicators for measuring performance of building construction companies in Kingdom of Saudi Arabia. J King Saud Univ Eng Sci. 2013; 25(2): 125–134p.
ISO 9000 - Quality Management. International Organization for Standardization.
Ali AS, Rahmat I. The performance measurement of construction projects managed by ISO-certified contractors in Malaysia. J Retail Leisure Prop. 2009; 9: 25–35p.
Kim N, Park M, Lee HS, Roh S. Performance management method for construction companies. 24th International Symposium on Automation & Robotics in Construction (ISARC 2007) Construction Automation Group. I.I.T. Madras. 2007.
Chan APC, Ho DCK, Tam CM. Design and build project success factors; multivariate analysis. J Constr Eng Manag. 2001; 127(2): 93–100p.
Kagioglou MC, Aouad R, Hinks G, Sexton J, Stealth D. Generic Design and Construction Process Protocol, Final Report. The University of Salford; 2001.
Karim K, Marosszeky M. Process monitoring for process re-engineering using key performance indicators. International Conference on Construction Process Reengineering, CPR 99. Sydney UNSW. 12–13 July, 1999.
Belassi W, Tukel OI. A new framework for determining critical success/failure factors in projects. Int J Proj Manag. 1996; 14(3): 141–151p.
Herbsman Z, Ellis R. Research on factors influencing construction productivity. Constr Manag Econ. 1990; 118(1): 49–61p.
DOI: https://doi.org/10.37628/ijce.v5i1.500
Refbacks
- There are currently no refbacks.